2024
- Master Plan
- Master Plan with Town for Callahan Ballfields and Vacant Land (In Progress)
- $40,000 FMLD Grant received for striping and seal coating Community Park and Recreation Center Parking lots
- $170,000 FMLD Grant received for a new trail along Battlement Parkway at the Recreation Center
- $25,000 FMLD Grant received to renovate the sauna at the Recreation Center
2023
- $150,000 FMLD Grant received for Recreation Center Roof Phase 2
2022
- $264,000 FMLD Grant received for Recreation Center Roofing Phase I
- $98,700 FMLD Grant received for Recreation Center Irrigation Non-potable water upgrade
2021
- Applied for and received $100,000 in COVID Relief Funds, bringing total to $307,000
- Applied for and received $4,000 from Garfield County for security cameras
- Received $5,000 grant from Metcalf Excavation for upgrades to ballfield
BATTLEMENT MESA GOLF CLUB
2024
- Callahan’s Restaurant remodeling at the golf course is complete
- New Cart Paths on 2 Green up to 4 Tee Box
- Aeration System installed for the pond on hole number 8
2023
- New Cart Path Holes 10 Tee, 18 Green, Hole 8 all, Hole 9 Tees
- Planning for Golf Course Restaurant Remodel
2022
- New landscaping for the clubhouse
New Grass area right of number 17
Remodel of the pro shop and office
New LED lights for the entire facility
2021
- Completed irrigation system on entire 18 holes: Cost $2.1M; $400,000 less than prior estimate. Will save electrical and water.
- Replaced some golf maintenance equipment •
- Cracked, filled, and repaired cart paths
- Golf revenue is expected to increase $83,000 over 2020 (to $583,000 in 2021). A 16% increase.
- Painted exterior of clubhouse and maintenance building
GRAND VALLEY REC CENTER
2024
- 220 electrical installed for bands and DJ’s in the gym
- Power pole in the cardio area with dedicated individual circuit breakers for each treadmill
- Power pole in lobby with dedicated individual breakers for treadmills and TV
- Updated BECs unit and agitator for pool sanitation
- Roof phase II complete
- Parking Lot seal coating and striping
- Low painting throughout the building
- Fitness Equipment updates (Weights, row machine, free standing benches)
- Grand Valley Room table and chair upgrade
- Irrigation Wiring
- Sewer Line Epoxy Coated
2023
- Irrigation Upgrade- Raw Water Use, Valves, Wiring and Controller Replaced
- New LED Lighting Complete
- New Roof is 90% Complete
- New Equipment- Treadmills, Ellipticals and Weight Equipment
- New Event- Buck Fever 5k
- New Jerseys for Baseball, Softball and Basketball
- Maintenance for Outdoor Pickleball- Cracks Filled and striped
2022
- Supply line plumbing for the men’s and women’s locker rooms, including hot water
recirculation line providing hot water rapidly to the entire facility - New tile in the men’s and women’s locker rooms
- New LED light fixtures for all indoor public space at the Recreation Center
- New water transfer and pump station to utilize non-potable water for recreation center
irrigation - Upgrade all irrigation valves to scrubber valves in preparation for non-potable water
- Tile on wall behind the hot tub replaced
- Two new wall showers on the pool deck installed for convenient rinsing
- New fitness equipment for the Recreation Center
2021
- Purchased and installed additional security cameras
- Installed BAF fans in pool area
- Replaced some cardio equipment
- Reconstructed tennis court to multi-use court to allow for pickleball & basketball
- Increased sale of merchandise
- Upgraded dugouts at ballfield
- Installed new appliances at concession stand, donation from Lowes
- Replaced gym windows
PARKS AND TRAILS
2024
- Bricks R Us Project Completed at the Community Park
- Tanker Trail at Community Park renovated
- Native area irrigation at Community Park completed
2023
- Upgraded median with irrigation and vegetation/plants
- Infield Renovation at the Callahan Ballfields